The partially standing building as a result of the explosion in “Surmalu” was demolished: The two-way traffic has been restored

As a result of the works carried out by the owner of the “Surmalu” Shopping Center, the partially standing building was demolished. The area has been cleared; the construction debris have been moved.

The Yerevan Municipality reported.

Works are also being carried out to improve the adjacent sidewalk. Since 12 October, two-way traffic has been restored for vehicles on Kristapori Street.

Iravaban.net

Հետևեք մեզ Facebook-ում

  Պատուհանը կփակվի 6 վայրկյանից...   Փակել